Friday, April 29, 2011

Ready for inspection

Another week down.....I have no idea how many more to go.

Thomas got the house wired for sound, TV and internet this week. Here is a picture of where one of the speakers will go.

The T.V. will be placed above the fireplace and here is a shot of the hidden wires.

Another photo of the fireplace as it goes through the second floor. Wish we had enough money to put in a second story fireplace but we are over budget on the first one.

We have inspection on Monday and the shower pan had to be completed before inspection. Here is our future shower holding water and ready for inspection.

Here is a picture of our barrel ceiling. Our drywall contractor needed some additional support so our framer was given another job to do this week. I have a feeling he will think twice about framing a house with a barrel ceiling again.

Even with the added job of the ceiling they did get the entire house sheeted and....

all the pocket doors framed in and....

made some progress on the girls' decks

I guess this is the other deck. I am not sure what Quinn is mad about but he sure doesn't look happy.

So next week we hope to pass inspection and move on to insulation and sheet rocking!

1 comment: